Area:
Province Subbasin %
Mountain Snake Salmon 100.00%
Contract Number:
46273 REL 157
Contract Title:
2007-402-00 EXP NOAA SOCKEYE SALMON CAPTIVE BROOD
Contract Continuation:
Previous: Next:
46273 REL 141: 2007-402-00 EXP NOAA SOCKEYE SALMON CAPTIVE BROOD
  • 83639 REL 2: 2007-402-00 EXP NOAA SOCKEYE SALMON CAPTIVE BROOD
Contract Status:
Closed
Contract Description:
PROJECT GOAL:

The project's primary goal is to provide a safety net captive broodstock population that can be used to sustain Snake River sockeye salmon (Oncorhynchus nerka).  The program's secondary goal is to generate fish that can be used to speed the rebuilding of this population listed as Endangered under the U. S. Endangered Species Act.

The Salmon Subbasin Plan includes these future goals for Redfish Lake Sockeye:

• Natural spawning component of 2,000 adults, based on the NOAA Fisheries interim abundance de-listing criteria.
• Long-term return of 8,000 - 44,500, based on management plans.
• For FY 2019 produce up to 1,000 maturing adults that can be released to spawn naturally or used to produce up to 600,000 eyed eggs for transfer to Columbian Basin smolt production facilities.


BACKGROUND:

The National Oceanic and Atmospheric Administration's National Marine Fisheries Service (NOAA Fisheries), Northwest Fisheries Science Center (NWFSC), in partnership with Idaho Department of Fish and Game (IDFG) has been maintaining U.S. Endangered Species Act (ESA) listed Snake River sockeye salmon from Redfish Lake, Idaho in a captive broodstock program since 1991.  Captive broodstocks are a form of artificial propagation where fish are cultured in captivity for most or all of their life cycle.  These programs provide a safety net to prevent populations from going extinct.  Captive broodstock programs generate much higher egg-to-spawner survival (usually > 50%) than occurs in nature (usually < 0.2 %).  This higher in-culture survival of captive broodstock salmon enables them to produce a large number of eggs, fry, and smolts per generation for use in restoration programs.  This large number of progeny per generation is being used by the program to assist the restoration of Redfish Lake sockeye salmon.

In the Salmon Subbasin Summary, federal, state, and tribal agencies repeatedly call for artificial production programs, like the Redfish Lake sockeye salmon captive broodstock program, to meet goals and objectives (Section 5.2, Fisheries Needs 14 and 15).  The continuation of current programs, such as the Redfish Lake sockeye salmon captive broodstock program, is also a required reasonable and prudent action (Item 177) in the NOAA Fisheries 2000 FCRPS Biological Opinion, an Updated Proposed Action (Hatchery UPA 13) in the 2004 Biological Opinion on Remand (Sections 6.14.2.3 and 9.3), and RPA 41 of the 2008 and subsequent FCRPS Biological Opinions.  In addition, the implementation and refinement of captive broodstocks for the recovery of Snake River sockeye salmon have been identified as priorities in the 1994 Northwest Power Planning Council's (NWPPC) Columbia Basin Fish and Wildlife Program (7.4A.1-3), are part of the overarching and regional objectives of the 2000 NWPPC Columbia Basin Fish and Wildlife Program, and are priorities described in the 2015 NOAA Fisheries Recovery Plan for Snake River salmon.

Between 1991 and 2017, NOAA Fisheries has captively reared the progeny of sockeye salmon that returned to Redfish Lake.  Captive propagation of these fish from fall 1994 through 2018 has resulted in thousands of prespawning adults; hundreds of thousands of eyed eggs; and thousands of juveniles being provided to IDFG for release to Stanley Basin lakes.  In upcoming years, the cooperative NOAA Fisheries/IDFG Redfish Lake captive broodstock program should continue to provide large numbers of animals for use in recovery efforts.  NOAA Fisheries feels that continuation of the cooperative captive broodstock program is imperative to the recovery of Snake River Sockeye Salmon (NMFS 2015).


EXPECTED OUTCOME:

Because of the critically low population size of Redfish Lake sockeye salmon, captive broodstocks appear to offer the only hope to maintain the species while the recovery plan is being implemented.  The maintenance of geographically separate captive brood populations at Eagle, Idaho and Manchester-Burley, Washington will remain a key factor in reducing the risk of catastrophic loss of the Redfish Lake sockeye salmon gene pool from mechanical failure, human error, or disease.   The NOAA-Fisheries captive broodstock project expects to produce up to 1,000 maturing fish during the current contract cycle.  It is anticipated the project will supply up to 600,000 eyed eggs for use in the smolt production programs during this contract cycle.  During this contract cycle the project will continue to maintain at least 1,000 fish from each of three broodyears in the safety net for this ESA listed stock.  In aggregate, these actions will continue to prevent the extinction of Snake River Sockeye salmon and produce fish for release in the rebuilding of this ESA listed species.
Account Type(s):
Expense
Contract Start Date:
01/01/2019
Contract End Date:
12/31/2019
Current Contract Value:
$850,676
Expenditures:
$850,676

* Expenditures data includes accruals and are based on data through 31-Oct-2024.

BPA CO:
BPA COR:
Env. Compliance Lead:
Work Order Task(s):
Contract Type:
Release
Pricing Method:
Cost Reimbursement (CNF)
Click the map to see this Contract's location details.

No photos have been uploaded yet for this Contract.

Viewing of Work Statement Elements

Deliverable Title WSE Sort Letter, Number, Title Start End Concluded
All Environmental Compliance Activities Complete A: 165. Obtain Environmental Compliance 12/31/2019 12/31/2019
RPA/BiOP Snake River Sockeye Salmon data submitted to IDFG project leader B: 202. Snake River Sockeye Salmon RPA/BiOp Data 02/28/2019 03/28/2019
FY 19 Burley Creek Freshwater Rearing Location Maintenance Activities Complete C: 61. Burley Creek Freshwater Rearing Location 12/31/2019 12/31/2019
FY 19 Manchester Research Station Seawater Rearing Location Activities Complete D: 61. Manchester Research Station Seawater Rearing Location 12/31/2019 12/31/2019
FY 18 Fish Culture Coordination Activities Complete E: 189. Regional Coordination- Fish Culture Activities 12/31/2019 12/31/2019
Incubate and rear BY 2018 captive broodstock F: 176. Incubate And Rear BY 2018 Captive Broodstock 12/31/2019 12/31/2019
Rear BY 2017 captive broodstock G: 176. Rear BY 2017 Captive Broodstock 12/31/2019 12/31/2019
Rear BY 2016 captive broodstock H: 176. Rear BY 2016 Captive Broodstock 12/31/2019 12/31/2019
Rear BY 2015 Captive Broodstock I: 176. Rear BY 2015 Captive Broodstock 12/31/2019 12/31/2019
Rear BY 2014 captive broodstock J: 176. Rear BY 2014 Captive Broodstock 12/31/2019 12/31/2019
Rear BY 2013 Captive Broodstock K: 176. Rear BY 2013 Captive Broodstock 12/31/2019 12/31/2019
Spawn, fertilize and incubate BY 2019 eggs L: 176. Spawn BY 2013 through BY 2017 Mature Fish and Fertilize And Incubate Their Eggs To Produce BY 2019 Eyed Eggs To Supply Smolt Production Facilities 12/31/2019 12/31/2019
PIT-Tag and adipose fin clip BY 2017 pre-smolts M: 158. PIT-Tag and adipose fin clip BY 2017 pre-smolts 02/28/2019 02/28/2019
2019 annual maintenance plan for NOAA sockeye salmon culture facilities N: 174. 2019 Annual Maintenance Plan For NOAA Sockeye Salmon Culture Facilities 12/31/2019 12/31/2019
Completed Annual Report O: 132. Submit Final Progress Report For The Period January 2017 To December 2017 10/15/2019
Completed Annual Report P: 132. Submit Final Progress Report For The Period January 2018 To December 2018 12/31/2019
Project Mgmt. and Admin Activities Complete and submittal of new FY 2020 contract package Q: 119. Manage Project And Prepare New FY 2020 SOW With Budget 12/31/2019 12/31/2019

Viewing of Implementation Metrics
Viewing of Environmental Metrics Customize

Primary Focal Species Work Statement Elements
Sockeye (O. nerka) - Snake River ESU (Endangered)
  • 7 instances of WE 176 Produce Hatchery Fish
  • 2 instances of WE 61 Maintain Artificial Production Facility/Infrastructure
  • 1 instance of WE 174 Produce Plan
  • 1 instance of WE 158 Mark/Tag Animals

Sort WE ID WE Title NEPA NOAA USFWS NHPA Has Provisions Inadvertent Discovery Completed
A 165 Obtain Environmental Compliance 01/01/2019
B 202 Snake River Sockeye Salmon RPA/BiOp Data
C 61 Burley Creek Freshwater Rearing Location 11/07/2018
D 61 Manchester Research Station Seawater Rearing Location 11/07/2018
E 189 Regional Coordination- Fish Culture Activities 01/01/2019
F 176 Incubate And Rear BY 2018 Captive Broodstock 11/08/2018
G 176 Rear BY 2017 Captive Broodstock 11/08/2018
H 176 Rear BY 2016 Captive Broodstock 11/08/2018
I 176 Rear BY 2015 Captive Broodstock 11/08/2018
J 176 Rear BY 2014 Captive Broodstock 11/08/2018
K 176 Rear BY 2013 Captive Broodstock 11/08/2018
L 176 Spawn BY 2013 through BY 2017 Mature Fish and Fertilize And Incubate Their Eggs To Produce BY 2019 Eyed Eggs To Supply Smolt Production Facilities 11/08/2018
M 158 PIT-Tag and adipose fin clip BY 2017 pre-smolts 11/08/2018
N 174 2019 Annual Maintenance Plan For NOAA Sockeye Salmon Culture Facilities 01/01/2019
O 132 Submit Final Progress Report For The Period January 2017 To December 2017 01/01/2019
P 132 Submit Final Progress Report For The Period January 2018 To December 2018 01/01/2019
Q 119 Manage Project And Prepare New FY 2020 SOW With Budget 01/01/2019
R 185 Periodic Status Reports for BPA 01/01/2019